Local permit context for El Paso
Site plan requirements can change with the project, property, reviewing authority and location. We use the information you provide, your survey or plat when available, and the applicable review context to prepare a clear permit-oriented drawing.
Popular permit projects in El Paso
Choose the closest project type to see the drawing scope we typically prepare for that permit.

Pool Site Plans
Pools, decks, equipment and barrier locations.

Fence Site Plans
Fence runs, gates, easements and property context.

Garage / Shed Plans
Detached garages, workshops, sheds and carports.

Home Addition Plans
Additions, remodels, porches and accessory work.

Commercial Site Plans
Retail, office, warehouse and commercial site scopes.

Deck / Patio Plans
Decks, patios, covers and outdoor structures.
Permit drawing services in El Paso
Need more than a site plan? Use this directory to move from property layout into architectural, structural, MEP or permit-support drawings.
Building drawings
What your El Paso site plan may need to show
The exact checklist depends on the project and reviewing authority. Common items include:
- Property / lot lines and dimensions
- Existing and proposed structures
- Required setbacks and building lines
- Easements and rights-of-way
- Driveways, parking and site access
- Utilities shown when the scope requires them
- Septic or well locations when applicable
- Drainage or floodplain information when applicable
- North arrow, scale and project notes
- Other items requested by the reviewing authority

More project types we support in El Paso
Browse project-specific permit pages for living-space additions, outdoor structures, accessory buildings and commercial improvements.
Site & commercial
El Paso permit and site-plan guidance
El Paso sits at the far western tip of Texas, where desert lots, arroyos and fast-growing neighborhoods on the east and west sides all shape what a permit review looks for. Whether you are adding a room, building a new home or improving a commercial lot, the City expects drawings that clearly show the property and the proposed work.
Site Plans TX prepares permit-ready site plans for El Paso properties across El Paso County, drawn from your survey or plat and the scope of your project.
Who reviews permits in El Paso?
Permits are handled by the City of El Paso Planning & Inspections department through its One-Stop Shop at 811 Texas Avenue. Applications, plan uploads and inspection requests run through the City’s Citizen Access Portal (Accela).
Zoning and development rules live in the El Paso Code of Ordinances, and the City publishes an interactive zoning map along with current and preliminary flood zone maps.
What a El Paso site plan needs to show
Requirements vary by project, but El Paso reviewers commonly look for:
- Property lines and lot dimensions
- Existing and proposed structures with distances to each property line
- Setbacks for the property’s zoning district
- Easements, driveways and access
- Flood zone information where the lot is affected
- Drainage direction away from structures
Local rules that affect El Paso projects
- A permit is required to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building.
- Flood zone mapping includes both current and preliminary maps, so a lot’s status should be checked before drawing.
- Historic Areas and Infill Development Areas can add review steps for some properties.
- Plan submittal deposits apply at the time of submittal.
Projects we draw site plans for in El Paso
In El Paso we most often prepare plans for home additions, new single-family homes, carports, patio covers, block walls, accessory buildings and commercial site improvements. Every plan is drawn for the actual lot, with dimensions the reviewer can check quickly.
Before you submit in El Paso
- Check the flood zone maps for your parcel first
- Confirm whether the lot sits in a historic or infill area
- Have your survey or plat ready
- Know your zoning district before setting setbacks
Source: City of El Paso official permit information. Requirements change, so confirm current rules with the City before you submit.



One team for the drawing scope around your site plan
Some permits stop at a site plan. Others expand into architectural, structural, MEP or Texas PE-reviewed work. We can coordinate the next drawing scope when the project requires it.
- Residential and commercial permit plans
- Structural drawings and calculations
- MEP coordination where included in scope
- Texas PE review where required and professionally accepted
How it works
Send the property details
Share the address, project type, survey or plat if available, and any permit comments.
We confirm the drawing scope
We review the information and identify the likely site-plan or permit drawing scope.
Receive the permit drawings
We prepare the agreed drawings and support covered drafting revisions if the reviewer comments.
El Paso site plan FAQs
Do I need a site plan for a permit in El Paso?
Most new buildings, additions and site improvements in El Paso need a drawing that shows where the work sits on the lot. Permits are handled by the City of El Paso Planning & Inspections department through its One-Stop Shop at 811 Texas Avenue. Smaller projects may only need a marked survey, so confirm the requirement for your specific scope.
Where do I submit permit drawings in El Paso?
Applications, plan uploads and inspection requests run through the City's Citizen Access Portal (Accela).
What should a El Paso site plan show?
Typically property lines and lot dimensions, existing and proposed structures with distances to each property line, setbacks for the property's zoning district, easements, driveways and access, plus any items the reviewer asks for on your project.
Can Site Plans TX guarantee approval?
No. The City of El Paso and any other reviewing authority make the final decision. We draw the agreed site plan from your property information and fix covered drafting comments at no charge.




