Commercial site plans, drawn for Texas review.

Parking, fire access, utilities and drainage in one coordinated plan

Retail pads, offices, warehouses, metal buildings and tenant improvements all start with a site plan the city can approve. We draft commercial site plans to your city, county or ETJ rules and coordinate a Texas-licensed engineer where a seal is required.

Satisfaction guaranteed badgeMoney-back guarantee badge24 hour fast turnaround badge

Get a free quote

Send the address and project. We reply with what your city needs and a price.

Add your name.
Add a valid email so we can send the quote.
Pick the project type.
Add the property address.

Free quote. No obligation. We reply in business hours.

Texas-focused permit drawings
Scope confirmed before drafting
Residential + commercial support
All 254 Texas counties
Revision support within scope

What a Texas commercial site plan shows

Every plan is drawn for your actual lot from your survey or plat, with the details your reviewer checks first.

  • Property lines, bearings and lot area
  • Building footprint, square footage and use
  • Parking count, stall sizes and accessible spaces
  • Drive aisles, driveways and curb cuts
  • Fire lanes and hydrant locations
  • Accessible routes from parking to entrances
  • Water, sewer and meter locations
  • Drainage, detention and grading notes
  • Landscaping, screening and dumpster enclosures
  • Zoning of the site and abutting parcels
Commercial site plan review in Texas
Commercial site plan review in Texas
Commercial site plan with parking and drive aisles
Commercial site plan with parking and drive aisles
Retail and office building frontage
Retail and office building frontage
STREETRETAIL BUILDING12,000 SFADADRIVE AISLE 24 FTFIRE LANEFHDUMPDETENTIONDRIVE1234567N030 FTSAMPLE DRAWING
Sample layout for illustration. Your plan is drawn from your own survey or plat.

Example commercial site plan

This is the kind of drawing your permit office reviews. Each numbered item is something we show on your plan.

  1. 1Building footprint with use and square footage
  2. 2Parking rows with stall count and accessible spaces
  3. 3Fire lane with hydrant placement
  4. 4Driveway curb cuts with drive aisle widths
  5. 5Dumpster enclosure and screening
  6. 6Landscape islands and buffer
  7. 7Detention area and drainage direction
Get a plan like this

Commercial projects we draw site plans for

Tell us what you are building and we draw the plan your city expects for that project.

Retail and restaurant pads

New pads, drive-throughs and parking layouts sized to your city parking ratio.

Office and medical buildings

Site layout, accessible routes and parking for new buildings and expansions.

Warehouses and metal buildings

Truck access, loading areas and fire lanes for industrial and storage sites.

Tenant improvements and change of use

Updated site plans when a new use changes parking or accessibility needs.

Multifamily and townhomes

Unit layout, parking, open space and utility coordination.

Churches, schools and community buildings

Parking, drop-off circulation and fire access for assembly uses.

Plans and projects like yours

A look at the drawings and project types this service covers in Texas.

Commercial site plan with fire lane and hydrants
Commercial site plan with fire lane and hydrants
Commercial layout with parking, landscaping and walks
Commercial layout with parking, landscaping and walks
Metal building permit project
Metal building permit project
Printed site plan for permit submission
Printed site plan for permit submission

Common reasons reviewers ask for corrections

These are recurring review issues we account for when preparing the agreed drawing scope.

  • Parking count does not match the use and square footage
  • Fire lane width or hydrant spacing missing
  • Accessible route from parking to the entrance not shown
  • Drainage, detention or grading not addressed
  • Plan not sealed where a Texas PE seal is required

What we need from you

Start with the information you already have. We identify any missing measurements, records or design inputs before drafting proceeds.

  1. Property addressSo we can confirm the city, county or ETJ rules.
  2. Survey or recorded plat when availableA PDF or clear image is fine. If it is unavailable, we confirm what source information is needed before drafting.
  3. Project detailsWhat you are building, its size and where it goes on the lot.
  4. Photos or a sketchOptional, but they help us place the work accurately.

Who we draw these plans for

Homeowners ordering one plan and contractors ordering every week get the same review and turnaround.

DevelopersGeneral contractorsArchitectsBusiness ownersProperty managersFranchise owners

From property information to a coordinated permit set

We confirm the project inputs first, then draft and coordinate only the sheets included in the agreed scope.

1

Send your address

Share the property address, project details and any survey or plat you have.

2

Get scope and price

We confirm what your city or county requires and send a clear quote.

3

We draft the plan

Your plan is drawn to scale with every dimension the reviewer checks.

4

Submit with confidence

You get a permit-ready PDF, and we fix covered review comments for free.

Money-back guarantee seal

Permit-review support after delivery.

Covered drafting comments within the agreed scope can be revised as part of the correction workflow. Added design, engineering or jurisdictional scope is quoted separately when required.

See the guarantee

Questions about commercial site plans in Texas

Straight answers to what Texas owners and contractors ask us most.

What is a commercial site plan?

A commercial site plan is a scaled drawing of the whole property that shows the building, parking, access, fire lanes, utilities, drainage and landscaping. The city uses it to check zoning, fire and engineering rules before reviewing the building plans.

Does a commercial site plan in Texas need a PE seal?

Many do. Drainage, grading, utility and structural elements on commercial projects often need a Texas-licensed engineer. We confirm what your city requires and coordinate the seal when it applies.

What is the difference between a site plan and a site development plan?

A site plan shows the layout. A site development plan, or civil set, adds engineering sheets such as grading, drainage, utilities and erosion control. Larger commercial projects usually need both.

How long does a commercial site plan take?

It depends on the size of the site and what the city asks for. We confirm scope and timeline with your quote after reviewing the address.

Can you update an existing site plan for a tenant improvement?

Yes. We update parking counts, accessible routes and use information on an existing plan when a new tenant or use changes what the city reviews.

More Texas permit drawing services

Other plans we draw for Texas permits.

Serving every Texas city and county

Local permit guides for our most-requested cities. We draw for all 254 Texas counties.

Start your Texas permit drawing request.

Send the address and project details. We review the scope and reply with the next step.

Get a free quote

Send the address and project. We reply with what your city needs and a price.

Add your name.
Add a valid email so we can send the quote.
Pick the project type.
Add the property address.

Free quote. No obligation. We reply in business hours.

💬 Get a Site Plan

Need a Site Plan?

Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us:

WhatsApp Us Email Us