Drafted Against the Code Your City Actually Enforces.

Delivered in 12–24 Hours

Houston reviews under Chapter 42 of the City Code — not a zoning map. Austin requires a site plan for every application under Land Development Code Title 25. Travis County commercial projects need a plan sealed by a Texas-licensed engineer, with drainage and erosion control included. We know which rule applies to your address before we draw the first line.

Satisfaction guaranteed badge Money back guarantee badge Fast delivery badge
10,000+ plans delivered
99% first-submission approval
Texas-licensed PE network
12–24 hour turnaround
Free corrections, always
Code Authority

Every Texas Jurisdiction Runs on a Different Rulebook. We Know Which One Applies to You.

REFERENCE: AUTHORITY INDEX
JURISDICTIONS: 05  |  REGION: TX
Texas has no single statewide residential building code. Cities adopt their own, and the site plan requirement — and the authority reviewing it — changes block by block:
JUR-01 No zoning
Houston
Houston Permitting Center — Chapter 42, City Code
Setbacks, lot size, and parking come from Chapter 42 and, outside city limits, from Harris County deed restrictions — not a zoning map.
JUR-02 Aquifer protected
Austin
Development Services Dept. — Land Development Code Title 25
A site plan for every building permit application, reviewed for impervious cover limits, Edwards Aquifer watershed protection, and heritage tree preservation.
JUR-03 PE sealed
Travis County
Travis County TNR / Development Services — Unincorporated
Site plan sealed by a Texas-licensed engineer, including grading, drainage, an erosion and sedimentation control plan, and — for larger projects — a Traffic Impact Analysis.
JUR-04 Fire + utility
Fort Worth
Development Services, Permits Division
Full site plan including fire lane access, fire hydrant locations, and utility/civil site plan for water and sanitary sewer.
JUR-05 BPA required
Bexar County
Bexar County Public Works + Fire Marshal — Unincorporated
A Building Permit Authorization (BPA) from Public Works is required before the Fire Marshal will issue the permit — a step most out-of-state drafters miss entirely.

This is the difference between a template and a site plan that actually gets approved: we draft against the code your specific reviewer is holding, not a generic national format.

Verified for Houston, Austin, Fort Worth, San Antonio, and 200+ Texas jurisdictions
What We Deliver

From a Same-Day Site Plan to a Full Stamped Drawing Set

DWG SET: PERMIT SUBMITTAL
SHEETS: 02  |  JURISDICTION: TX
Site plan for permit submittal FIG. A1 — SITE PLAN
SHEET A1 Most ordered

Site Plan Only

The scaled, dimensioned drawing your building department needs to review setbacks and lot coverage.

  • Property boundaries and dimensions, labeled in feet
  • Existing structures drawn to scale (house, garage, driveway, pool)
  • Proposed project labeled "PROPOSED" with exact dimensions
  • All four setback distances to each property line
  • North arrow, scale bar, parcel ID, and address
  • Formatted for your jurisdiction's submittal portal
Scale As noted
Delivery 12–24 hr
Starting from $79
SHEET A2 Full permit package

Full Architectural, Structural & MEP Drawing Set

For ADUs, new construction, additions, remodels, commercial buildings, tenant improvements, and metal building projects needing a complete permit package.

Architectural
Site Plan Floor Plans Roof Plan Elevations (4) Sections (2) 3D Render Window Schedule Door Schedule
Structural
Foundation Plan Framing Plans Roof Framing Foundation Details Wall Details Roof Details Floor Details
MEP + Specialty
Electrical Plans Plumbing Plans HVAC Plans Equipment Schedules Electrical Load Calc Landscaping Plan Fire Safety Plan
Full architectural and structural drawing set FIG. A2 — FULL SET
Scale Per project
Delivery By scope
Pricing Quoted

NOTE: Additional scope — major design revisions, engineering calculations, energy code reports, or authority-comment responses beyond the original set — is quoted separately.

Our Services

Services

PROJECT INDEX
ITEMS: 10  |  REGION: TX
SVC-01 ADU accessory dwelling unit
ADU / Accessory Dwelling Unit
Full architectural + structural set, Austin HOME Initiative-ready
Get a quote
SVC-02 Deck addition replacement
Deck Addition / Replacement
Site plan + structural detail
Get a quote
SVC-03 Porch patio cover sunroom
Porch / Patio Cover / Sunroom
Site plan through framing plan
Get a quote
SVC-04 Shed storage building
Shed / Storage Building
$79 entry tier
Get a quote
SVC-05 Pool pool house outdoor structure
Pool / Pool House / Outdoor Structure
IRC R326 barrier compliance built in
Get a quote
SVC-06 Single family home new construction
Single Family Home / New Construction
Complete 30-sheet capable set
Get a quote
SVC-07 Home addition remodeling
Home Addition / Remodeling
Foundation, framing, elevations
Get a quote
SVC-08 Commercial building tenant improvement
Commercial Building / Tenant Improvement
Texas-licensed PE seal, TAS-compliant
Get a quote
SVC-09 Metal building steel structure
Metal Building / Steel Structure
TDLR-aware for industrialized components
Get a quote
SVC-10 PE stamp engineering seal
PE Stamp Only
Already have drawings? A Texas-licensed engineer reviews and seals them
Get a quote
All services include free corrections and are formatted for your jurisdiction's submittal portal
Jurisdiction Coverage

Built for the Jurisdiction You're Actually Submitting To

COVERAGE: 50 STATES
REVIEW BODIES: CITY & COUNTY LEVEL
TX‑01 Houston, TX

Chapter 42, Not Zoning

Houston is the only major U.S. city with no citywide zoning ordinance. Development is governed by Chapter 42 of the City Code and reviewed by the Houston Permitting Center — setbacks and lot coverage trace back to that code and, outside the city, to Harris County deed restrictions.

Read the Houston authority page
TX‑02 Austin, TX

LDC Title 25, Every Application

Austin's Development Services Department requires a site plan for every non-residential or zoning-change project under Land Development Code Chapter 25‑5, reviewed alongside Austin Energy, Austin Water, Austin Fire, and Watershed Protection. Impervious cover, heritage trees, and Edwards Aquifer rules all apply.

Read the Austin authority page
TX‑03 Travis County, TX

Sealed, Not Optional

Unincorporated Travis County commercial site plans must be sealed by a Texas-licensed engineer and include grading, a drainage report, an erosion and sedimentation control plan, and — for projects over 1,000 daily vehicle trips — a full Traffic Impact Analysis.

Read the Travis County authority page
TX‑04 Fort Worth, TX

Fire Access Is Part of the Plan

Fort Worth's Development Services reviews site plans for fire lane access, the nearest fire hydrant location, and a full utility/civil site plan showing water and sanitary sewer — not just setbacks.

Read the Fort Worth authority page
TX‑05 San Antonio / Bexar County, TX

The BPA Step Most Drafters Miss

Unincorporated Bexar County requires a Building Permit Authorization from Public Works before the Fire Marshal's Office will issue the permit. Skip it and your submission stalls regardless of how good the drawing is.

Read the Bexar County authority page

Also serving Dallas, Frisco, McKinney, Plano, Sugar Land, Pearland, Round Rock, Georgetown, New Braunfels, and every Texas city and county.

Track Record

10,000+ Plans. 99% First-Submission Approval.

PERFORMANCE LOG
SINCE: 2021  |  STATUS: ACTIVE
METRIC-01
10,000+
Site plans delivered
Residential, commercial, and mixed-use site plans delivered since 2021 across every major Texas jurisdiction.
METRIC-02
99%
First-submission approval
Plans accepted on the first submittal to the building department — because we draft against the right code from the start.
METRIC-03
12hrs
Avg. correction turnaround
When corrections are needed, they're free and returned within 12 hours on average — not days.
Verified across Houston, Austin, Fort Worth, San Antonio, and 200+ Texas jurisdictions
POL-01 Service Guarantee
EFFECTIVE: ALL ORDERS

If a Building Department Rejects It, We Fix It Free. That's the Whole Policy.

Most delays don't come from a bad drawing — they come from a drawing built against the wrong jurisdiction's rules. Because we identify your exact authority (city, county, or ETJ) before drafting, corrections are rare. When they do happen, they're free, with a 12-hour turnaround.

100% Money-Back Guarantee - Permit Approved
Free corrections on every order
12-hour correction turnaround
Jurisdiction verified before drafting
PE Requirement

Texas Requires a Licensed PE on Every Commercial Permit. No Exceptions.

TBPE REGULATION
SCOPE: COMMERCIAL  |  STATE: TX
Licensed
Engineer
State of Texas
No small-project exemption for commercial PE review in Texas
Texas Accessibility Standards extend past federal ADA in several categories
Every commercial site plan needs a Texas-licensed engineer's seal
REG-01 Why this matters

Texas has no small-project exemption for commercial PE review — unlike some states. Every commercial site plan needs a Texas-licensed engineer's seal, and commercial projects must meet Texas Accessibility Standards, which extend past federal ADA in several categories.

We work with a network of Texas-licensed PEs so commercial and multi-family projects are never held up waiting on a signature.
Authority TBPE
Compliance TAS + ADA
PE Network TX-Licensed
Process

How It Works

WORKFLOW: 4 STEPS
AVG. COMPLETION: 12–24 HR
1
Step one
Send your address and project type.
Tell us what you're building and where. That's all we need to start.
WhatsApp Email Order Form
2
Step two
We identify your jurisdiction.
City limits, ETJ, or unincorporated county — each has a different reviewing authority and rule set. We confirm which one applies before drafting.
3
Step three
We draft against that authority's actual requirements.
Chapter 42 for Houston, LDC Title 25 for Austin, sealed drainage plans for Travis County commercial — not a generic template.
4
Step four
You submit. Corrections are free.
12-hour turnaround if your building department requests changes. No extra charge, no questions.
Most orders completed in 12–24 hours from submission
Common Questions

Questions We Get Before Every Site Plan

REFERENCE: FAQ
ITEMS: 8  |  REGION: TX

In nearly every Texas city and county, yes — for any project changing your property's footprint. Requirements are set locally, and in places like Houston, by deed restriction rather than zoning.

Houston has never adopted a citywide zoning ordinance. Development is instead governed by Chapter 42 of the City Code, reviewed by the Houston Permitting Center, with land use outside city limits controlled by deed restrictions recorded with Harris County.

Austin requires a site plan for every non-residential or zoning-change application under Land Development Code Title 25, with specific review for impervious cover limits, Edwards Aquifer watershed protection, and heritage tree preservation.

Usually not for straightforward residential work. Commercial permits require one statewide, with no exemption — and Travis County commercial projects specifically require a sealed drainage and erosion control plan.

A site plan shows your property, setbacks, and the proposed project footprint — what most residential permits need. A full drawing set adds floor plans, framing, elevations, MEP layouts, and schedules — required for full home builds, additions, and commercial projects.

12–24 hours for most residential site plans. Full architectural, structural, and MEP sets are quoted individually based on scope.

We fix it for free, with a 12-hour standard turnaround — provided it's a correction, not a change in project scope.

Yes. We confirm whether your property is inside city limits, in a city's extraterritorial jurisdiction, or fully unincorporated — each has a different reviewing authority, and we draft to match.

Still not sure what your project needs?
Start Your Project

Tell Us About Your Project

Fill this out and we'll confirm your jurisdiction and exactly what your building department needs — before you pay for anything.

↑
Drag files here or click to browse
PDF, JPG, PNG, DOC, DWG, DXF — up to 5 files, 10MB each
We reply within one business day — faster on WhatsApp.
Get Started

Tell Us Your Address. We'll Tell You What Your City Actually Requires.

Before you pay for anything, we'll confirm your jurisdiction and exactly what your building department needs to see.

Client Reviews

What Texas Property Owners Say

RATING: 4.9 / 5
REVIEWS: 400+  |  TYPE: HOMEOWNER FEEDBACK
CLIENT FEEDBACK

EXCELLENT

★★★★★

Based on 400+ reviews

Collected directly from homeowners we've worked with across Texas.

Pablo Pesantez

Pablo Pesantez

6 months ago · Houston, TX
★★★★★✓

Site Plans TX made the process simple and fast. Houston's Chapter 42 rules are confusing if you don't do this every day — they sent a clean, permit-ready site plan the next day.

Read more
Rita Baker

Rita Baker

7 months ago · Austin, TX
★★★★★✓

Great communication and professional work. They knew Austin's LDC Title 25 requirements cold and prepared the plan exactly the way the city needed it.

Read more
Minerva Gonzalez

Minerva Gonzalez

7 months ago · San Antonio, TX
★★★★★✓

I needed a pool permit site plan with setbacks and barrier compliance. Turnaround was quick, and Bexar County accepted the plan without a single revision.

Read more
O

Oscar

4 months ago · Fort Worth, TX
★★★★★✓

Very reliable service. Fort Worth's building department asked for a small fire-lane revision, and they turned it around fast at no extra charge.

Read more
D

Daniel Foster

3 weeks ago · Katy, TX
★★★★★✓

Needed an ADU site plan for a rental property in Katy. They confirmed the county setback rules before drafting so there were zero surprises at permit submission.

Read more
P

Priya Nair

1 month ago · Sugar Land, TX
★★★★★✓

Our home addition needed a full site plan and elevations. Fast turnaround and they answered every question about Fort Bend County requirements.

Read more
M

Marcus Webb

2 months ago · Plano, TX
★★★★★✓

Simple deck permit, done right. Site plan was accepted by the city on the first submission.

Read more
E

Elena Torres

5 months ago · El Paso, TX
★★★★☆✓

Good experience overall for our metal building project. One round of revisions was needed but they handled it quickly and at no cost.

Read more
J

Jerome Bailey

3 months ago · Round Rock, TX
★★★★★✓

Ordered the $79 shed plan and had it in hand within a day. Exactly what our building department asked for.

Read more
G

Grace Lin

6 weeks ago · Frisco, TX
★★★★★✓

Pool site plan came back with all the barrier compliance details already built in. Saved us a lot of back and forth with the inspector.

Read more
A

Anthony Ruiz

4 months ago · McKinney, TX
★★★★★✓

Full new construction site plan and it was thorough — grading, drainage, everything the city wanted to see.

Read more
S

Samantha Cole

2 weeks ago · Georgetown, TX
★★★★★✓

Quick and professional. Our patio cover permit was approved without any corrections needed.

Read more
V

Victor Nguyen

5 months ago · Denton, TX
★★★★★✓

Commercial tenant improvement site plan, PE sealed and TAS compliant. Exactly what our contractor needed for permitting.

Read more
B

Brianna Hughes

7 months ago · Corpus Christi, TX
★★★★★✓

Loved how they confirmed our exact jurisdiction before drafting anything. No wasted time on a plan that wouldn't get approved.

Read more
K

Kevin Park

1 month ago · Waco, TX
★★★★★✓

Straightforward process from start to finish. Deck addition plan was accepted the first time.

Read more
M

Monica Alvarez

3 months ago · League City, TX
★★★★☆✓

Solid work on our home addition plan. Took a bit longer than expected but the quality was there.

Read more
T

Trevor Simmons

8 months ago · Lubbock, TX
★★★★★✓

Fast and affordable for a simple storage shed permit. Would use again.

Read more
A

Angela Ford

2 months ago · Amarillo, TX
★★★★★✓

They knew exactly what our pool house project needed for permitting, down to the barrier code requirements.

Read more
R

Ray Delgado

4 months ago · Tyler, TX
★★★★★✓

New home site plan was detailed and professional. The building department had no issues.

Read more
M

Michelle Dawson

6 months ago · College Station, TX
★★★★★✓

Great for our small commercial buildout. PE seal was ready fast and the city accepted it right away.

Read more
O

Omar Haddad

1 month ago · Midland, TX
★★★★★✓

Metal building site plan came back quickly and covered everything TDLR needed for our industrialized components.

Read more
C

Cassandra Reed

5 months ago · Odessa, TX
★★★★★✓

Very responsive team. Our addition permit went through without a single revision.

Read more
W

Wesley Chan

3 months ago · Laredo, TX
★★★★★✓

Booked the ADU package and had a permit-ready plan in under 24 hours. Impressive turnaround.

Read more
N

Natalie Brooks

7 months ago · Beaumont, TX
★★★★★✓

Sunroom addition site plan was done right the first time. Clear communication throughout.

Read more
D

Derek Simmons

2 months ago · Pearland, TX
★★★★★✓

Deck replacement permit approved fast. They made the whole process painless.

Read more
Y

Yolanda Marsh

4 weeks ago · New Braunfels, TX
★★★★★✓

Ordered a shed plan for our backyard project. Quick, affordable, and accepted without issue.

Read more
P

Preston Clarke

6 months ago · Harris County, TX
★★★★☆✓

Good work on our new build site plan, though we had to follow up a couple times for updates.

Read more
I

Isabel Moreno

3 months ago · Travis County, TX
★★★★★✓

They handled our unincorporated Travis County drainage report requirements without missing a beat.

Read more
C

Chris Whitfield

5 months ago · Bexar County, TX
★★★★★✓

They caught the Building Permit Authorization step for our Bexar County project before it became a problem. Saved us weeks.

Read more
R

Renee Castillo

2 months ago · Dallas, TX
★★★★★✓

Home addition plan came back clean and detailed. Would recommend to anyone building in Dallas.

Read more
A

Andre Whitfield

1 month ago · Houston, TX
★★★★★✓

Second project we've used them for in Houston. Consistent quality and they know Chapter 42 inside and out.

Read more
S

Sara Whitmore

3 weeks ago · Austin, TX
★★★★★✓

ADU plan was HOME Initiative ready exactly as promised. Made our permit process so much easier.

Read more
J

Julian Ortiz

4 months ago · Fort Worth, TX
★★★★★✓

Pool site plan handled the fire lane and utility requirements Fort Worth wanted to see. No issues at all.

Read more
K

Katherine Boyd

6 months ago · San Antonio, TX
★★★★★✓

Already had drawings done and just needed a PE stamp. Fast review and sealed within days.

Read more

Had a good experience? A quick Google review helps other Texas homeowners find us.

Review Us on Google

Latest Guides

💬 Get a Site Plan

👋 Need a Site Plan?

Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us:

WhatsApp Us Email Us