Site Plan for a Permit in Amarillo, Texas

Permit-ready site plans and drawing sets for Amarillo properties, prepared to your local review requirements.

  • 12 to 24 hour delivery
  • Free corrections if rejected
  • Money-back guarantee
10,000+Site plans delivered
254Texas counties
12 to 24 hrTypical turnaround
99%Approval rate
Site plan for a permit in Amarillo, Texas
Site plan for a permit in Amarillo, Texas
Site plan for a permit in Amarillo, Texas
Site plan for a permit in Amarillo, Texas

What your site plan includes

Each Amarillo site plan is drawn for the actual property and the scope your review requires.

  • Property lines with dimensions
  • Existing and proposed structures
  • Setbacks and building lines
  • Easements and right-of-way
  • Driveways, parking and access
  • Impervious cover calculations
  • Drainage flow direction
  • North arrow, scale and legend
  • Title block with project details
  • Permit-ready PDF for portal upload

Amarillo anchors the Texas Panhandle, where wind, cold winters and wide lots shape construction. Shops, garages, additions and new homes are common projects, and the Building Safety Department expects an approved, stamped plan set on site.

Site Plans TX prepares permit-ready site plans for Amarillo properties across Potter and Randall counties, drawn from your survey or plat and the scope of your project.

Who reviews permits in Amarillo?

Permits are reviewed by the City of Amarillo Building Safety Department in the Simms Municipal Building, 808 S. Buchanan Street, Suite 104. Applications are submitted and tracked through MGO Connect.

The City enforces the 2021 International Residential Code with local amendments in Ordinance 7101, and zoning is set by the Amarillo Code of Ordinances.

What a Amarillo site plan needs to show

Requirements vary by project, but Amarillo reviewers commonly look for:

  • Property lines and lot dimensions
  • Existing and proposed buildings
  • Setbacks
  • Easements and alleys
  • Driveways and flatwork

Local rules that affect Amarillo projects

  • An approved set of plans stamped by the department must be on the job site during inspections.
  • Structures over 600 square feet need a foundation depth of at least 24 inches.
  • Foundation anchor bolts are spaced no more than 6 feet apart.
  • Masonry inspections are required before veneer goes on.

Projects we draw site plans for in Amarillo

In Amarillo we most often prepare plans for shops and metal buildings, detached garages, carports, additions and new homes. Every plan is drawn for the actual lot, with dimensions the reviewer can check quickly.

Before you submit in Amarillo

  • Plan footing depth for larger buildings
  • Show alleys and utility easements
  • Keep a stamped set on site
  • Confirm Potter or Randall County parcel data

Frequently asked questions

Do I need a site plan for a permit in Amarillo?

Most new buildings, additions and site improvements in Amarillo need a drawing that shows where the work sits on the lot. Permits are reviewed by the City of Amarillo Building Safety Department in the Simms Municipal Building, 808 S. Buchanan Street, Suite 104. Smaller projects may only need a marked survey, so confirm the requirement for your specific scope.

Where do I submit permit drawings in Amarillo?

Applications are submitted and tracked through MGO Connect.

What should a Amarillo site plan show?

Typically property lines and lot dimensions, existing and proposed buildings, setbacks, easements and alleys, plus any items the reviewer asks for on your project.

Can Site Plans TX guarantee approval?

No. The City of Amarillo and any other reviewing authority make the final decision. We draw the agreed site plan from your property information and fix covered drafting comments at no charge.

Source: City of Amarillo official permit information. Requirements change, so confirm current rules with the City before you submit.

How it works

Three steps from address to permit-ready drawings.

1

Send your address

Share the property address, project type and any survey or sketch you have.

2

Get scope and price

We confirm what Amarillo requires and send a clear quote.

3

Receive your plans

Permit-ready drawings, with free corrections if the reviewer comments.

Why Amarillo owners choose Site Plans TX

10,000+Site plans delivered
254Texas counties served
12 to 24 hrTypical turnaround
99%Approval rate

Your Amarillo permit, without the back and forth.

Send your address and project type today. We confirm requirements and price, then get to work.

Get a free quote

Send the address and project. We reply with what your city needs and a price.

Add your name.
Add a valid email so we can send the quote.
Pick the project type.
Add the property address.

Free quote. No obligation. We reply in business hours.

💬 Get a Site Plan

Need a Site Plan?

Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us:

WhatsApp Us Email Us