Site Plan for a Permit in El Paso, Texas

Permit-ready site plans and drawing sets for El Paso properties, prepared to your local review requirements.

  • 12 to 24 hour delivery
  • Free corrections if rejected
  • Money-back guarantee
10,000+Site plans delivered
254Texas counties
12 to 24 hrTypical turnaround
99%Approval rate
Site plan for a permit in El Paso, Texas
Site plan for a permit in El Paso, Texas
Site plan for a permit in El Paso, Texas
Site plan for a permit in El Paso, Texas

What your site plan includes

Each El Paso site plan is drawn for the actual property and the scope your review requires.

  • Property lines with dimensions
  • Existing and proposed structures
  • Setbacks and building lines
  • Easements and right-of-way
  • Driveways, parking and access
  • Impervious cover calculations
  • Drainage flow direction
  • North arrow, scale and legend
  • Title block with project details
  • Permit-ready PDF for portal upload

El Paso sits at the far western tip of Texas, where desert lots, arroyos and fast-growing neighborhoods on the east and west sides all shape what a permit review looks for. Whether you are adding a room, building a new home or improving a commercial lot, the City expects drawings that clearly show the property and the proposed work.

Site Plans TX prepares permit-ready site plans for El Paso properties across El Paso County, drawn from your survey or plat and the scope of your project.

Who reviews permits in El Paso?

Permits are handled by the City of El Paso Planning & Inspections department through its One-Stop Shop at 811 Texas Avenue. Applications, plan uploads and inspection requests run through the City’s Citizen Access Portal (Accela).

Zoning and development rules live in the El Paso Code of Ordinances, and the City publishes an interactive zoning map along with current and preliminary flood zone maps.

What a El Paso site plan needs to show

Requirements vary by project, but El Paso reviewers commonly look for:

  • Property lines and lot dimensions
  • Existing and proposed structures with distances to each property line
  • Setbacks for the property’s zoning district
  • Easements, driveways and access
  • Flood zone information where the lot is affected
  • Drainage direction away from structures

Local rules that affect El Paso projects

  • A permit is required to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building.
  • Flood zone mapping includes both current and preliminary maps, so a lot’s status should be checked before drawing.
  • Historic Areas and Infill Development Areas can add review steps for some properties.
  • Plan submittal deposits apply at the time of submittal.

Projects we draw site plans for in El Paso

In El Paso we most often prepare plans for home additions, new single-family homes, carports, patio covers, block walls, accessory buildings and commercial site improvements. Every plan is drawn for the actual lot, with dimensions the reviewer can check quickly.

Before you submit in El Paso

  • Check the flood zone maps for your parcel first
  • Confirm whether the lot sits in a historic or infill area
  • Have your survey or plat ready
  • Know your zoning district before setting setbacks

Frequently asked questions

Do I need a site plan for a permit in El Paso?

Most new buildings, additions and site improvements in El Paso need a drawing that shows where the work sits on the lot. Permits are handled by the City of El Paso Planning & Inspections department through its One-Stop Shop at 811 Texas Avenue. Smaller projects may only need a marked survey, so confirm the requirement for your specific scope.

Where do I submit permit drawings in El Paso?

Applications, plan uploads and inspection requests run through the City’s Citizen Access Portal (Accela).

What should a El Paso site plan show?

Typically property lines and lot dimensions, existing and proposed structures with distances to each property line, setbacks for the property’s zoning district, easements, driveways and access, plus any items the reviewer asks for on your project.

Can Site Plans TX guarantee approval?

No. The City of El Paso and any other reviewing authority make the final decision. We draw the agreed site plan from your property information and fix covered drafting comments at no charge.

Source: City of El Paso official permit information. Requirements change, so confirm current rules with the City before you submit.

How it works

Three steps from address to permit-ready drawings.

1

Send your address

Share the property address, project type and any survey or sketch you have.

2

Get scope and price

We confirm what El Paso requires and send a clear quote.

3

Receive your plans

Permit-ready drawings, with free corrections if the reviewer comments.

Why El Paso owners choose Site Plans TX

10,000+Site plans delivered
254Texas counties served
12 to 24 hrTypical turnaround
99%Approval rate

Your El Paso permit, without the back and forth.

Send your address and project type today. We confirm requirements and price, then get to work.

Get a free quote

Takes 30 seconds. Tell us the project and address, we reply with what your city needs and a price.

1. What do you need?
Tap the option that fits your project.
Add the property address so we can check the lot.
3. Your details
Add your name.
Add a phone number we can reach.
Add a valid email so we can send the quote.

Free quoteNo obligationNo spam

💬 Get a Site Plan

Need a Site Plan?

Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us:

WhatsApp Us Email Us