Local permit context for Temple
Site plan requirements can change with the project, property, reviewing authority and location. We use the information you provide, your survey or plat when available, and the applicable review context to prepare a clear permit-oriented drawing.
Popular permit projects in Temple
Choose the closest project type to see the drawing scope we typically prepare for that permit.

Pool Site Plans
Pools, decks, equipment and barrier locations.

Fence Site Plans
Fence runs, gates, easements and property context.

Garage / Shed Plans
Detached garages, workshops, sheds and carports.

Home Addition Plans
Additions, remodels, porches and accessory work.

Commercial Site Plans
Retail, office, warehouse and commercial site scopes.

Deck / Patio Plans
Decks, patios, covers and outdoor structures.
Permit drawing services in Temple
Need more than a site plan? Use this directory to move from property layout into architectural, structural, MEP or permit-support drawings.
Building drawings
What your Temple site plan may need to show
The exact checklist depends on the project and reviewing authority. Common items include:
- Property / lot lines and dimensions
- Existing and proposed structures
- Required setbacks and building lines
- Easements and rights-of-way
- Driveways, parking and site access
- Utilities shown when the scope requires them
- Septic or well locations when applicable
- Drainage or floodplain information when applicable
- North arrow, scale and project notes
- Other items requested by the reviewing authority

More project types we support in Temple
Browse project-specific permit pages for living-space additions, outdoor structures, accessory buildings and commercial improvements.
Site & commercial
Temple permit and site-plan guidance
Temple sits along I-35 in Bell County, with a growing medical and industrial base. Every residential application includes a plot or site plan, and the City has 10 business days to review after payment.
Site Plans TX prepares permit-ready site plans for Temple properties across Bell County, drawn from your survey or plat and the scope of your project.
Who reviews permits in Temple?
Permits are reviewed by the City of Temple Building Permits & Inspections department. Applications are submitted through MGO Connect.
Development standards are set by the Temple Unified Development Code (UDC).
What a Temple site plan needs to show
Requirements vary by project, but Temple reviewers commonly look for:
- Plot or site plan
- Property lines and dimensions
- Existing and proposed structures
- Setbacks under the UDC
- Easements and driveways
Local rules that affect Temple projects
- Residential applications include a plot or site plan per the Residential Permit Submittal Requirements.
- The City has 10 business days to review and comment after payment.
- No work may start before the permit is approved.
- Permit fees are non-refundable.
Projects we draw site plans for in Temple
In Temple we most often prepare plans for new homes, additions, shops, carports and commercial sites. Every plan is drawn for the actual lot, with dimensions the reviewer can check quickly.
Before you submit in Temple
- Follow the residential submittal list
- Upload through MGO Connect
- Confirm UDC setbacks
- Wait for approval before starting
Source: City of Temple official permit information. Requirements change, so confirm current rules with the City before you submit.



One team for the drawing scope around your site plan
Some permits stop at a site plan. Others expand into architectural, structural, MEP or Texas PE-reviewed work. We can coordinate the next drawing scope when the project requires it.
- Residential and commercial permit plans
- Structural drawings and calculations
- MEP coordination where included in scope
- Texas PE review where required and professionally accepted
How it works
Send the property details
Share the address, project type, survey or plat if available, and any permit comments.
We confirm the drawing scope
We review the information and identify the likely site-plan or permit drawing scope.
Receive the permit drawings
We prepare the agreed drawings and support covered drafting revisions if the reviewer comments.
Temple site plan FAQs
Do I need a site plan for a permit in Temple?
Most new buildings, additions and site improvements in Temple need a drawing that shows where the work sits on the lot. Permits are reviewed by the City of Temple Building Permits & Inspections department. Smaller projects may only need a marked survey, so confirm the requirement for your specific scope.
Where do I submit permit drawings in Temple?
Applications are submitted through MGO Connect.
What should a Temple site plan show?
Typically plot or site plan, property lines and dimensions, existing and proposed structures, setbacks under the UDC, plus any items the reviewer asks for on your project.
Can Site Plans TX guarantee approval?
No. The City of Temple and any other reviewing authority make the final decision. We draw the agreed site plan from your property information and fix covered drafting comments at no charge.




