Texas Site Plans for Building Permits

One Site Plan Service. Every Texas Jurisdiction.

Texas has no statewide building code — each city and county sets its own rules, from Houston's Chapter 42 to Austin's Land Development Code Title 25 to Travis County's sealed-drainage requirement. We draft your site plan against the code your specific address falls under, wherever in Texas that is.

10,000+ plans delivered
99% first-submission approval
Texas-licensed PE network
12–24 hour turnaround
Free corrections, always
Service Definition

What a Site Plan Is, and Why Your Texas Building Department Wants One

DOCUMENT TYPE: SITE PLAN
APPLIES TO: ALL TX PERMITS
DEF-01 What's included

A site plan is a scaled, top-down drawing of your property — the first document a Texas permit reviewer opens, because it answers the questions that decide whether your application moves forward or gets sent back.

Every site plan we deliver includes
  • Property boundaries and dimensions, labeled in feet
  • All existing structures — house, garage, driveway, pool — drawn to scale
  • The proposed project, clearly labeled "PROPOSED," with exact dimensions
  • Setback distances to every property line
  • North arrow, scale bar, parcel ID, and property address
  • Formatted for your specific city or county's submittal portal

This is the document nearly every Texas building department needs before it will issue a permit for a fence, a pool, an addition, an ADU, or new construction — regardless of which of Texas's 254 counties your property sits in.

See our full architectural / structural / MEP drawing set
Sample site plan drawing for Texas building permit FIG. SP-01 — SAMPLE SITE PLAN
Required by every Texas city and county for projects changing your property's footprint
Why This Matters

Texas Doesn't Have One Set of Rules. We Built Around That, Not Around It.

JURISDICTIONS: 254 COUNTIES
VARIANCE: HIGH
There is no statewide residential building code in Texas. Cities and counties each adopt and enforce their own — which means the site plan that clears review in one Texas city can get rejected in the next one over.
JUR-01 Houston, TX
No Zoning Ordinance — At All
Development runs on Chapter 42 of the City Code and deed restrictions recorded with Harris County — not a zoning map.
JUR-02 Austin, TX
Site Plan for Every Permit Application
Required under Land Development Code Title 25, with review for impervious cover limits, heritage tree preservation, and Edwards Aquifer watershed protection.
JUR-03 Travis County
PE-Sealed with Full Drainage Plans
Commercial site plans outside city limits must be sealed by a Texas-licensed engineer and include a full drainage and erosion control plan.
JUR-04 Fort Worth, TX
Fire Access Is Part of the Package
Site plans reviewed for fire lane access and hydrant locations as part of the standard package, not just setbacks.
JUR-05 San Antonio / Bexar County
The BPA Step Most Drafters Miss
Requires a Building Permit Authorization from Public Works before the Fire Marshal will issue a permit in unincorporated areas.
JUR-06 DFW Suburbs
Independent Departments, Different Rules
Frisco, McKinney, Plano, Arlington each run independent permitting — a plan built for Dallas proper won't automatically match what Plano's office expects.

We identify which jurisdiction your property falls under — city limits, extraterritorial jurisdiction (ETJ), or unincorporated county — before we draft a single line, and we build the plan against that specific authority's actual requirements.

See how we handle your city specifically
Covering 254 Texas counties — city limits, ETJ, and unincorporated areas
Coverage Area

Site Plans for Every City and County in Texas

COVERAGE: 254 COUNTIES
STATUS: ACTIVE

We draft for every Texas jurisdiction, with dedicated coverage in the state's fastest-growing and highest-permit-volume metros:

METRO-01
Houston Metro
Houston, Sugar Land, Pearland, League City, Katy, The Woodlands, Missouri City, Baytown, Conroe
Harris · Fort Bend · Brazoria · Galveston · Montgomery
METRO-02
Dallas–Fort Worth Metro
Dallas, Fort Worth, Frisco, McKinney, Plano, Arlington, Grand Prairie, Irving, Garland, Denton, Mansfield
Dallas · Tarrant · Collin · Denton
METRO-03
Austin Metro
Austin, Round Rock, Cedar Park, Georgetown, Pflugerville, Leander, Kyle, Buda
Travis · Williamson · Hays
METRO-04
San Antonio Metro
San Antonio, New Braunfels, San Marcos, Schertz, Boerne, Seguin
Bexar · Comal · Guadalupe · Hays · Kendall
REGION-05
West Texas
El Paso, Lubbock, Amarillo, Midland, Odessa, San Angelo, Abilene
El Paso · Lubbock · Potter · Midland · Ector · Tom Green · Taylor
REGION-06
East Texas
Tyler, Longview, Texarkana, Waco, Huntsville, Bryan / College Station
Smith · Gregg · Bowie · McLennan · Walker · Brazos
REGION-07
Gulf Coast & Rio Grande Valley
Corpus Christi, Beaumont, Victoria, McAllen, Edinburg, Harlingen, Brownsville
Nueces · Jefferson · Victoria · Hidalgo · Cameron
REGION-08
Central Texas
Killeen, Temple, Copperas Cove
Bell · Coryell
Don't see your city listed? We draft for all 254 Texas counties, incorporated or not — every order starts with us confirming your exact jurisdiction before drafting begins.
Who We Serve

Built for Everyone Building in Texas

AUDIENCE: 7 SEGMENTS
SCOPE: RESIDENTIAL + COMMERCIAL
AUD-01 Homeowner reviewing site plan
Homeowners
Adding a fence, a pool, a deck, or an addition and need a plan that clears local review the first time.
AUD-02 General contractor on site
General Contractors & Builders
Running multiple Texas job sites who need fast, jurisdiction-accurate turnaround so the site plan is never the bottleneck.
AUD-03 Pool installer checking plans
Pool, Deck & Fence Installers
Order site plans as a standard part of every project — need barrier and setback compliance shown correctly across different cities' codes.
AUD-04 ADU construction in Austin
ADU Builders
Navigating city-specific ADU rules from Austin's HOME Initiative to Houston's deed-restriction-first approach.
AUD-05 Real estate developer reviewing plans
Real Estate Developers
Building new construction or commercial projects across multiple Texas jurisdictions with different drainage, floodplain, and impervious cover standards.
AUD-06 Property manager with plans
Property Managers & HOAs
Need site plans for Architectural Review Committee submissions on fences, pools, and exterior modifications.
AUD-07 Metal building structure
Metal Building Dealers & Manufacturers
Texas customers need a site plan sized against the correct local code before their structure ships.
Serving residential, commercial, and industrial projects across every Texas jurisdiction
Process

How It Works

WORKFLOW: 4 STEPS
AVG. COMPLETION: 12–24 HR
1
Step one
Send your address and project type.
Tell us what you're building and where. That's all we need to start.
WhatsApp Email Order Form
2
Step two
We identify your jurisdiction.
City limits, ETJ, or unincorporated county — each has a different reviewing authority and rule set. We confirm which one applies before drafting.
3
Step three
We draft against that authority's actual requirements.
Chapter 42 for Houston, LDC Title 25 for Austin, sealed drainage plans for Travis County commercial — not a generic template.
4
Step four
You submit. Corrections are free.
12-hour turnaround if your building department requests changes. No extra charge, no questions.
Most orders completed in 12–24 hours from submission
Track Record

10,000+ Plans. 99% First-Submission Approval.

PERFORMANCE LOG
SINCE: 2021  |  STATUS: ACTIVE
METRIC-01
10,000+
Site plans delivered
Residential, commercial, and mixed-use site plans delivered since 2021 across every major Texas jurisdiction.
METRIC-02
99%
First-submission approval
Plans accepted on the first submittal to the building department — because we draft against the right code from the start.
METRIC-03
12hrs
Avg. correction turnaround
When corrections are needed, they're free and returned within 12 hours on average — not days.
Verified across Houston, Austin, Fort Worth, San Antonio, and 200+ Texas jurisdictions
POL-01 Service Guarantee
EFFECTIVE: ALL ORDERS

If a Building Department Rejects It, We Fix It Free. That's the Whole Policy.

Most delays don't come from a bad drawing — they come from a drawing built against the wrong jurisdiction's rules. Because we identify your exact authority (city, county, or ETJ) before drafting, corrections are rare. When they do happen, they're free, with a 12-hour turnaround.

100% Money-Back Guarantee - Permit Approved
Free corrections on every order
12-hour correction turnaround
Jurisdiction verified before drafting
PE Requirement

Texas Requires a Licensed PE on Every Commercial Permit. No Exceptions.

TBPE REGULATION
SCOPE: COMMERCIAL  |  STATE: TX
Licensed
Engineer
State of Texas
No small-project exemption for commercial PE review in Texas
Texas Accessibility Standards extend past federal ADA in several categories
Every commercial site plan needs a Texas-licensed engineer's seal
REG-01 Why this matters

Texas has no small-project exemption for commercial PE review — unlike some states. Every commercial site plan needs a Texas-licensed engineer's seal, and commercial projects must meet Texas Accessibility Standards, which extend past federal ADA in several categories.

We work with a network of Texas-licensed PEs so commercial and multi-family projects are never held up waiting on a signature.
Authority TBPE
Compliance TAS + ADA
PE Network TX-Licensed
Common Questions

Everything You Need to Know Before Ordering

REFERENCE: FAQ
ITEMS: 12  |  SCOPE: STATEWIDE

In nearly every Texas city and county, yes — for any project that changes your property's footprint, including fences, pools, decks, additions, ADUs, and new construction.

Texas has no statewide residential building code. Each city and county adopts and enforces its own rules, which is why a site plan built for one jurisdiction can be rejected in the next.

We confirm whether your address is inside city limits, in a city's ETJ, or in an unincorporated county area before drafting — each has a different reviewing authority.

Yes. We draft for all 254 Texas counties. If your city isn't listed on our coverage page, contact us and we'll confirm your jurisdiction's specific requirements.

A site plan shows your property, setbacks, and the proposed project footprint — what most residential permits need. A full drawing set adds floor plans, framing, elevations, and MEP layouts, required for full builds, additions, and most commercial projects.

Usually not for straightforward residential work. Every Texas commercial permit requires a PE seal statewide, with no small-project exemption.

12–24 hours for most residential services. ADU and commercial projects run 24–48 hours. Same-day rush delivery is available for +$75.

We fix it for free, 12-hour standard turnaround, provided the correction relates to our drafting and not a change in project scope.

Yes. Properties in a city's extraterritorial jurisdiction often follow that city's platting and setback rules even though they're technically outside city limits — we verify this before drafting.

Your property address and a description of the project. Additional details — measurements, an existing survey, project dimensions — help but aren't always required.

Yes, where applicable. Floodplain and drainage rules vary significantly — from Houston's post-Harvey elevation standards to Austin's Edwards Aquifer watershed protections — and we account for the ones that apply to your specific address.

Yes. Unincorporated county areas often have lighter site plan requirements, but floodplain, easement, and access rules can still apply — we confirm what's required for your specific location.

Still have questions? We respond within 1 business day
Start Your Project

Tell Us About Your Project

Fill this out and we'll confirm your jurisdiction and exactly what your building department needs — before you pay for anything.

Drag files here or click to browse
PDF, JPG, PNG, DOC, DWG, DXF — up to 5 files, 10MB each
We reply within one business day — faster on WhatsApp.
Get Started

Tell Us Your Address. We'll Tell You What Your City Actually Requires.

Before you pay for anything, we'll confirm your jurisdiction and exactly what your building department needs to see.

💬 Get a Site Plan

👋 Need a Site Plan?

Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us:

WhatsApp Us Email Us