Not a national template with "Texas" swapped into the header. A site plan service built around the fact that Houston has no zoning, Austin runs Land Development Code Title 25, and every county in between layers its own rules on top.
Site Plans TX is a Texas-focused permit planning and engineering coordination team serving homeowners, contractors, builders, developers, and property owners across the state.
We built a dedicated Texas site because Texas doesn't run on one set of rules the way a lot of states do. A generic 50-state template can tell you what a setback is. It can't tell you that Houston's front building line depends on whether your block is over 600 feet long, or that Travis County commercial projects need a sealed drainage report before anyone will look at them.
In 2021, Wasim founded a remote permit-drafting practice focused on clear, coordinated construction and site drawings for property owners and contractors.
So we built a team, a process, and a site around Texas jurisdictions specifically — led by Wasim, with 11 years of permit-drawing experience and 10,000+ plans delivered for property owners and contractors since 2021.
The scaled, dimensioned drawing your building department needs to review setbacks, lot coverage, and floodplain compliance.
For ADUs, new construction, additions, and commercial builds — floor plans, foundation plans, framing, elevations, and MEP layouts.
The 10,000+ site plans and 99% first-submission approval rate reflect work across the full Site Plans family — the same engineers and the same drafting process, now with a Texas-only focus. When your building department kicks back a comment, we fix it for free, with a 12-hour standard turnaround. That's not a promise we're making for the first time with this brand; it's the same policy that's held across every state we've worked in since 2021.
Houston, Dallas, Austin, San Antonio, Fort Worth, and everywhere in between — incorporated or not.
See full Texas coverageTexas requires a PE seal on every commercial permit, with no small-project exemption. Rather than bottleneck every commercial and multi-family order behind one engineer's schedule, we work with a network of Texas-licensed PEs so a stamp is never the thing holding your project up.
See our PE stamp serviceReach us directly — we respond within one business day, faster on WhatsApp.
Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us: