Commercial Site Plans for Permits — PE-Stamped, Formatted for Your County
Tenant improvement. New commercial construction. Parking layout. ADA compliance. Fire lanes. Drainage notation. PE stamp. We prepare the complete commercial permit site plan your building department requires — in 12—24 hours.
PE Stamp Included
12–24 Hour Delivery
Free Revisions Included
All 50 States
Commercial Permits Are Different From Residential. Here's How.
A residential site plan is one drawing — a scaled top-down view of a lot.
A commercial site plan is a coordinated package that must satisfy zoning, fire, ADA, stormwater, and engineering requirements simultaneously. Miss any one of those disciplines and the permit application is rejected.
Here is what makes commercial different:
| Element | Residential | Commercial |
|---|---|---|
|
PE
PE stamp
|
Sometimes | Always required — no exceptions |
|
P
Parking layout
|
Not required | Required — including ADA-compliant spaces |
|
A
ADA accessibility
|
Not required | Required — paths of travel, ramps, signage |
|
F
Fire lane
|
Not required | Required — width, radius, clear height marked |
|
D
Drainage plan
|
Sometimes | Required — stormwater management |
|
U
Utility connections
|
Basic notation | Full utility plan |
|
S
Setbacks
|
From property lines | Required review — property lines + fire separation distances |
|
R
Review timeline
|
2–4 weeks | Typically longer — 4–8 weeks |
The PE stamp is the most consequential difference. Commercial building permits require PE-stamped drawings throughout the United States — not just in Florida. There are no exceptions.
Commercial Project Types We Cover
Tenant Improvement (TI)
Converting an existing commercial space. New floor plan, updated MEP, ADA path of travel analysis. Most common commercial permit type we prepare. Requires PE stamp on structural and MEP drawings.
New Commercial Construction
Ground-up commercial building permit set. Site plan, building footprint, parking, fire lanes, utilities, stormwater, ADA. Most complex — full PE-stamped package.
Parking Lot / Expansion
ADA-compliant parking layout with correct space dimensions (9'×18' standard, 9'×18' van accessible, proper access aisle widths). Stormwater runoff direction. Pavement marking notation.
Change of Use / Occupancy
Converting a retail space to a restaurant, office to medical, or warehouse to retail triggers a Change of Occupancy review. ADA compliance from the public right-of-way to the primary function area. Life safety review.
Metal Building / Steel Structure
PE stamp mandatory. Wind load notation. Foundation plan. Florida Product Approval or NOA (HVHZ). All disciplines coordinated.
ndustrial / Warehouse
Loading dock placement, fire lane (minimum 20-foot clear width, 14-foot clear height), fire hydrant proximity notation, occupancy separation distances.
ADA Requirements on Commercial Site Plans
The Americans with Disabilities Act requires accessible design documentation on all commercial permit applications. Your commercial site plan must show:
Parking:
| Lot Size | Total Spaces | Required Accessible | Required Van Accessible |
|---|---|---|---|
| 1–25 spaces | 1 | 1 | 1 of the accessible |
| 26–50 spaces | 2 | 2 | 1 |
| 51–75 spaces | 3 | 3 | 1 |
| 76–100 spaces | 4 | 4 | 1 |
| 101–150 spaces | 5 | 5 | 2 |
| 151–200 spaces | 6 | 6 | 2 |
| 201–300 spaces | 7 | 7 | 3 |
| 301–400 spaces | 8 | 8 | 4 |
| 401–500 spaces | 9 | 9 | 4 plus 1 per 100 |
Path of travel:
- Accessible route from public right-of-way to building entrance
- Slope not to exceed 1:20 (5%) without being considered a ramp
- Cross slope not to exceed 1:50 (2%)
- Minimum 44-inch clear width
Signage notation:
- International Symbol of Accessibility on accessible spaces
- "Van Accessible" notation on van spaces
- Mounting height and location specified
Tell Us Your Address and Project Type.
We confirm scope and price within 2 hours.
Fire Lane Requirements on Commercial Site Plans
Fire access lanes must appear on every commercial site plan. Standard requirements — verify with your jurisdiction's fire marshal:
| Requirement | Standard Specification |
|---|---|
|
01
Clear width
|
20 feet minimum
|
|
02
Clear height
|
14 feet minimum
|
|
03
Turning radius
|
25 feet inside / 43 feet outside
for aerial trucks
|
|
04
Pavement
|
Must support
75,000 lbs
(fire apparatus)
|
|
05
Markings
|
"NO PARKING — FIRE LANE"
painted or signed per local code
|
|
06
Signage
|
Red
"No Parking — Fire Lane"
signs at required intervals
|
|
07
Dead-end maximum
|
150 feet
(beyond = turnaround required)
|
Project Snapshot
- Delray Beach, FL 33445
- Palm Beach County
- Garage to ADU Conversion
- Palm Beach County ePZB Portal
Delivered
- Site Plan
- Existing + Proposed Floor Plans
- Elevations — 4 sides
- Wall Framing Plan
- Electrical + Load Calculations
- Plumbing + Isometric Diagram
- HVAC + Manual J Report
- PE Stamp + Seal — FL-Licensed PE
From Your Address to Permit-Ready in 4 Steps
Send Your Details (2 minutes) Property address, project type, and any specific notes. Via WhatsApp, email, or our contact form.
We Research Your Property We pull your parcel from GIS records, verify your zoning district, confirm your setback requirements, check flood zone status, and determine your county’s portal formatting requirements. Every order. No templates.
We Draw Your Site Plan Drawn to scale. Every setback labeled. Every required element included. Formatted to pass your county’s building department review on first submission.
Delivered in 12–24 Hours Permit-ready PDF arrives in your inbox. If the building department sends back a correction, forward it — we update and resend within 12 hours at no extra charge.
PE Stamp — Mandatory for All Commercial Permits in the United States
Every commercial building permit in the United States requires drawings stamped by a licensed Professional Engineer.
This is not a Florida-specific rule. It applies in all 50 states. It applies to tenant improvements, new construction, change of occupancy, and commercial additions. There are no size or cost thresholds that exempt a commercial project from PE stamp.
What our commercial PE stamp includes:
- Florida-licensed PE (or licensed in the applicable state) review of all applicable drawings
- PE’s original signature, seal, and date on each structural and applicable sheet
- FBPE registration number on Florida projects
- Electronic seal (PDF) — accepted by all US building department portals
Commercial Site Plan Pricing
Commercial projects vary significantly in scope. Contact us for a firm quote within 2 hours based on your project type, required disciplines, jurisdiction, and permit submission requirements.
| Project Type | Starting From | Delivery |
|---|---|---|
|
TI
Tenant Improvement (Basic)
|
$399 | 24–48 hours |
|
MEP
Tenant Improvement (With MEP)
|
$799 | 48–72 hours |
|
ADA
Parking Lot / ADA Layout
|
$299 | 24 hours |
|
NC
New Commercial Construction
|
$999+ | 5–7 business days |
|
PE
Full Permit Set With PE Stamp
|
Contact us | Project-specific |
|
CO
Change of Use / Occupancy
|
$499 | 48 hours |
Need a confirmed commercial project price or a complete permit drawing package with MEP documentation?
WhatsApp: +1 (385) 885-5362 Full Permit Drawing SetFlorida Commercial Site Plans — What Changes in Florida
HVHZ (Miami-Dade + Broward)
All commercial permits require PE stamp (same as everywhere) PLUS wind load documentation, NOA-certified materials, and HVHZ-specific plan notation.
Florida Energy Conservation Code (FECC)
All commercial buildings with conditioned space must demonstrate energy compliance. Commercial energy compliance reports accompany the permit set.
Local municipal review:
Many Florida cities have their own building departments independent of the county — Fort Lauderdale, Miami, Tampa, Orlando, Hialeah each have their own permit portal separate from the county system.
Serving All 50 U.S. States
Every drawing set is prepared according to applicable state, county, and local permitting requirements.
State & Local Permit Requirements
Each site plan is formatted using available parcel information, applicable setbacks, zoning requirements, and local submission standards for the property’s jurisdiction.
Frequently Asked Questions (FAQs)
Does every commercial permit require a PE stamp?
Yes. Commercial building permits require PE-stamped drawings throughout all 50 US states — no exceptions, no size thresholds, no cost exemptions. → PE Stamp Services
How long does a commercial permit take?
Commercial permits take longer than residential — typically 4–8 weeks for review after submission. HVHZ counties (Miami-Dade and Broward) take 8–14 weeks. We prepare the drawings in 24–72 hours; the timeline is the building department’s review period.
What is an ADA path of travel and why is it on my site plan?
ADA requires that when you make alterations to a commercial space, you must also bring the path of travel from the public right-of-way to the altered area into ADA compliance. This path — parking spaces, curb ramps, walkways, entrance — must be documented on the site plan.
Can you prepare commercial site plans for all 50 states?
Yes. Every state, every county. PE stamp from a licensed engineer in the applicable state.
Do you handle commercial permits in Florida's HVHZ counties?
Yes. Miami-Dade and Broward commercial permits require additional documentation: wind load calculations, NOA-certified materials, HVHZ plan notation, and PE stamp. We prepare all of it. → Miami Commercial
Get Your Full Permit Set Quote
Tell us about your project. We confirm price and timeline within 2 hours.
- From $1,199 — complete package
- PE stamp included
- All 67 Florida counties
- 4–7 business days
- Free correction revisions